{
"pageType": "course-page",
"courseTitle": "EC201 Eclipse Commissioning I: Administration and Physics",
"courseTimeZone": "VarianThink",
"courseRegion": "americas",
"courseTrainingType": "virual",
"courseDescription": "This course provides training for the individual responsible for commissioning and administration of the Eclipse Treatment Planning System in a clinical, external beam radiation therapy department. The course focuses on the configuration of Eclipse dose calculation algorithms (AAA, AcurosXB, and eMC), including demonstration of model configuration and discussion of beam data requirements. Administrative tasks such as VSP settings (e.g. user login, user rights) and Radiation Oncology settings (e.g. Linac definition, CT scanner definition, imaging templates, tolerance tables, isodose templates, dosimetrically equivalent machines) are also included in this course. NOTE: This course does not cover the optimization algorithms, IMRT, VMAT or RapidArc (see EC202 Eclipse Commissioning II: IMRT and RapidArc).
",
"recommendedFor": "Physicists",
"courseCode": "EC201",
"courseUnavailable": "false",
}
EC201 Eclipse Commissioning I: Administration and Physics
Course Dates
2026-01-26 - 2026-01-30
2026-03-16 - 2026-03-20
2026-04-20 - 2026-04-24
2026-06-15 - 2026-06-19
Course Description
This course provides training for the individual responsible for commissioning and administration of the Eclipse Treatment Planning System in a clinical, external beam radiation therapy department. The course focuses on the configuration of Eclipse dose calculation algorithms (AAA, AcurosXB, and eMC), including demonstration of model configuration and discussion of beam data requirements. Administrative tasks such as VSP settings (e.g. user login, user rights) and Radiation Oncology settings (e.g. Linac definition, CT scanner definition, imaging templates, tolerance tables, isodose templates, dosimetrically equivalent machines) are also included in this course. NOTE: This course does not cover the optimization algorithms, IMRT, VMAT or RapidArc (see EC202 Eclipse Commissioning II: IMRT and RapidArc).